Project Title Four Laning of NH-39 (old NH-75) from Design Km 147+540 (Existing Km 148+020) (Bhogu Village) to Design Km 196+870 (Existing Km 197+420) (Sankha, Garhwa Road) in the State of Jharkhand on Hybrid Annuity mode (Package - III)
NH No. NH-39 (Old NH-75)
Client National Highways Authority of India
Independent Engineer M/s Dhruv Consultancy Services Pvt. LTD. JV With M/s Infra Solutions Associate with M/s Kaius Consulting Pvt. Ltd.
Concessionaire DRA Daltonganj Highway Private Limited.
EPC Contractor DRA Infracon Pvt. Ltd.
Bid Project cost (in Cr.) 818.00 Cr
Mode of Execution HAM
No of Lanes 4 (Four)
Date of award (LOA Date) 31st October,2022
Agreement Signing date 16th January, 2023
Appointed Date 9thNovember, 2023
Construction Period (in Days) 730 Days
O&M Period 15 Years
Schedule Date of Completion 730 Days From i.e. (7thNovember 2025).
Total Project Length 49.33Km (From Km. 147+540 To196+870)
Service / Slip Road Length 28.740 Km (BHS)
RE Wall Length 15324. m (BHS)
Box Culvert 117 Nos.
LVUP 04 Nos.
VUP 06 Nos.
Minor Bridge 16 No.
Major Bridge 04 No.
Toll Plaza 08 Lane Toll Plaza at Design Ch.156+850
Wayside Amenities/Service Areas 02 Nos.
Truck Lay-byes 02 Nos.
Bus-bay with Bus Shelter 08 Nos. (Both Side)
Minor junction 28 Nos.
Date of signing of Memorandum 24-October-2023

Project Timelines

The National Highways Authority of India awarded the contract of 4-lanning to DRA Daltonganj Highway Pvt. Ltd. on 31st October 2022. An SPV DRA Daltonganj Highway Pvt. Ltd. was formed for execution of the said Project. The agreement for the said Project was signed on 16th January 2023 between NHAI and DRA Daltonganj Highway Pvt. Ltd. Subsequently, joint Memorandum was signed and the Appointed Date was finalized on 09-11-2023 vide Authority letter No. NHAI/11012//JH/NH 75 (Sec-III)/2023-24/Eoffice-6337dated 09-11-2023 with its Scheduled Completion Date on 07-11 2025 i.e., 730 days from the Appointed Date.

Location and Usability

NH-75 (now NH-39) is an important highway which originates from Ranchi, state capital of Jharkhand and traversing through the towns of Daltonganj, Garhwa, Renukut, Shaktinagar, Sidhi, Rewa, Satna, Panna, Chhatarpur, finally terminates at Jhansi. In its total route length of 869 km, 260.660 km are in Jharkhand and remaining lengths are in the state of Uttar Pradesh and Madhya Pradesh. NH- 75 provides a connectivity to the people residing in the districts of Garhwa, Daltonganj, Latehar, Chatra and Lohardaga to Ranchi apart from providing an alternate route to Varanasi. Upon completion of 4-lanning section in Jharkhand state, it will provide a faster travel option to the places such as Varanasi, Prayagraj, industrial towns of Renukut and Anpara and other destinations. The 4-lanning of instant Package-III from Bhogu Village to Sankha from existing km.148+020 to km. 197+420 and design Ch. 147+540 to 196+870 is 49.33 km, which originates at a place Bhoghu near Daltonganj and having passed through the blocks of Medininagar, Pandwa, Nawabazar and finally ends at Bishrampur. Upon completion of this highway, inter connectivity between the states Chattisgarh & Jharkhand will be improved, which shall increase the economic condition of the district. Garhwa is one of the low-income districts of the state, where people mainly live on agriculture and forest products, they can take their agricultural products to the nearby cities, getting good price for their produces, which on other hand help in increasing their overall income.

Features

There are two bypasses proposed at Polpol (4280 m long) and at Daltonganj (11,120 m long) which passes through the agricultural land,11 minor bridges, 3VUPs, 2 LVUPs and 38 Box culverts of various sizes in the Project Highways. There are service roads provided in the inhabited area along the Highway, Bus Bay and wayside amenities were also provided. Upon completion, the Project Highway shall not only provide a fast connectivity but an improved safer connectivity as well. Completion of this project shall see an improvement of socio-economic condition of the people of the district and to the state at large.]